Download PDF version

Europe's largest green hydrogen production plant, located in Puertollano, Ciudad Real has become operational. The project, developed by Iberdrola for Fertiberia, generates green hydrogen using a 20 MW electrolyzer that separates hydrogen and oxygen molecules from the water via electrolysis.

Green hydrogen is the raw material for producing green ammonia, which in turn is used to manufacture low-carbon fertilizers. In addition, the project includes a 100 MW photovoltaic plant and a 5 MW/20 MWh battery energy storage system.

Lithium-ion batteries

Ingeteam was chosen by Iberdrola to be its technology partner for this battery system, which consists of a turnkey supply, where Ingeteam supplied the lithium-ion batteries integrated into 40-foot containers with water cooling and the battery converters integrated at the power stations with the remainder of the elements that are necessary for medium voltage connection.

Ingeteam also conducted the on-site assembly of the storage system and its subsequent commissioning.

produce green hydrogen

Additional progress has been made for plant hybridization with the construction of a project in Puertollano"

José Antonio Unanue, director of Ingeteam's storage business, emphasized that "this is a highly significant project.”

A few weeks ago Iberdrola and Ingeteam were in the news for commissioning the first photovoltaic plant in Spain to incorporate batteries (the Campo Arañuelo project), and now additional progress has been made for plant hybridization with the construction of a project in Puertollano that combines solar generation with battery energy storage supply an electrolyzer to produce green hydrogen also a strategic sector for Ingeteam".

solar energy availability

The battery system is used to store part of the photovoltaic energy generated during the daytime so that it can be used during the night. Thereby extending solar energy available for the production of green hydrogen via electrolysis.

The Puertollano project generates renewable hydrogen for the production of green ammonia and fertilizers by Fertiberia.

Scope of supply for the Campo Arañuelo photovoltaic complex

  • Four fully integrated 40-foot battery containers, 1.25MW/5MWh each
  • Battery liquid cooling system
  • Monitoring and control system integrated into the storage solution
  • A power station equipped with everything necessary to inject medium-voltage power: LV/MV transformer, medium-voltage switchgear, auxiliary services transformer, and switchboard
  • Four INGECON® SUN STORAGE Power B-Seriesbattery inverters
  • Storage system assembly
  • Storage system commissioning

In case you missed it

Siemens & GF Team Up For AI-Driven Semiconductor Growth
Siemens & GF Team Up For AI-Driven Semiconductor Growth

Siemens and GlobalFoundries (GF) have entered a new strategic collaboration to leverage each company’s complementary AI-based capabilities to enhance performance of semicondu...

WEG Supplies Transformers For Solar Project In Colombia
WEG Supplies Transformers For Solar Project In Colombia

WEG has consolidated an important supply for one of the largest asset management firms in Latin America. A company active in sectors such as infrastructure, credit, real estate, a...

Ceolin Group Modernizes With WEG Smart Machine
Ceolin Group Modernizes With WEG Smart Machine

Ceolin Group, a benchmark in agribusiness and responsible for more than 17,000 hectares of rice production between Uruguaiana (RS), Brazil, and Argentina, adopted WEG Smart Machine...

vfd