Download PDF version

Gephart Electric has teamed up with Ancoats Construction for the new SICK, Inc. Campus USA in Bloomington, MN. SICK is a pioneer manufacturer of factory, logistics and process automation technology worldwide.

This is the first phase in a larger master plan for SICK – a longtime client of Gephart – to consolidate all operations in one location. The new 140,400 SF building includes 38,400 SF of office space, 66,000 SF of logistics/warehouse space, and 36,000 SF of production/assembly space. Construction is underway and completion is scheduled for June, 2022. 

Download PDF version Download PDF version

In case you missed it

Advanced Engineering: Electrification Challenges & Trends
Advanced Engineering: Electrification Challenges & Trends

Electrification is gathering pace, moving from a mobility-focused trend into a catalyst for broader engineering and manufacturing change. As manufacturers, systems integrators and...

NFPA Survey: AI's Role In Skilled Trades 2025
NFPA Survey: AI's Role In Skilled Trades 2025

The National Fire Protection Association (NFPA) released findings from its third annual industry survey conducted at the NFPA 2025 Conference & Expo, the premier conference for...

Emerson's RX3i CPS400: SIL2 Safety Controller Launch
Emerson's RX3i CPS400: SIL2 Safety Controller Launch

Emerson has announced the new PACSystems RX3i CPS400 Safety Controller, designed to enable Safety Integrity Level 2 (SIL2) strategies for infrastructure, fire and gas, burner manag...

vfd