Wasatch Electric recently completed a comprehensive design and renovation project for 45,000 square feet of prime office space, achieving a rapid turnaround from design to owner occupancy in just four months.
This ultra-fast-track project demanded compressing the design process and expediting specialty lighting fixture procurement to meet the deadline.
Moreover, after the awarding of the contract, Wasatch successfully incorporated an extensive communications and data scope, along with sound masking, into the project—all completed in-house while adhering to the original schedule.
Minimizing Disruption to Operations
The renovation took place in the Draper, UT offices of a client, with a primary goal of minimizing interruptions to everyday operations. Wasatch Electric’s skilled team delivered a full suite of electrical services across two distinct floors of the building, including one that remained occupied during the renovations.
Comprehensive Electrical Solutions
The project scope comprised a range of systems and installations: electrical, fire alarms integrated with the existing building systems, raceways for security and audiovisual setups, power devices, lighting and control systems, telecommunications and data systems, and sound masking.
Each element was designed to enhance functionality and efficiency while being seamlessly integrated into the existing infrastructure.
Client Background
The client, formerly known as Symantec, is recognized in the field of cybersecurity technology and services. The company transitioned to Norton LifeLock in 2019 after acquisition by Broadcom Inc. This background emphasizes the importance of security and technology integration in the renovation project.