Download PDF version

RWE is well on track to become a pioneer in the floating wind and to have one gigawatt either in operation or under construction by 2030. 

To gain experience early and pave the way for commercial-scale floating wind, RWE is participating in multiple high-profile floating demonstration projects like the DemoSATH pilot project with Saitec Offshore Technologies.

Pre-lay of the mooring system

In early May, the anchor-handling vessel Maersk Mariner completed the installation of six mooring lines (comprised of hybrid lines of chain and fiber rope) and six drag anchors. The mobilization and loading of the mooring lines elements and preparation of the vessel was done at Punta Sollana quay, in the port of Bilbao (Spain), where the onshore construction of the floater is currently underway. 

DemoSATH mooring, anchoring and quick connect solution is set for the 2MW turbine that will be tested later this year and which will be the first floating turbine connected to the Spanish grid.

Download PDF version Download PDF version
  • Related companies
  • RWE
  • View all news from
  • RWE

In case you missed it

Comau Drives Affordable Automation In Advanced Manufacturing
Comau Drives Affordable Automation In Advanced Manufacturing

Comau has agreed to collaborate with multiple industry-pioneering companies, at an international level, addressing the need for affordable automation to drive advanced on-demand ma...

Comau's Automation Boosts Li Auto's EV Production
Comau's Automation Boosts Li Auto's EV Production

Comau has designed and developed cutting-edge automation technology for Li Auto’s next-generation range extender line, allowing the Chinese EV pioneer to reach an annual prod...

Energy Codes And BEPS: Net Zero Compliance Tactics
Energy Codes And BEPS: Net Zero Compliance Tactics

Decarbonization, Zero Waste, and Net Zero carbon emissions: they’re increasingly common goals for organizations, building owners, and facility managers. The first step towar...

vfd