Download PDF version

Shanghai Electric Environmental Protection Group and Henan Jincheng Environmental Protection Technology Co., Ltd. have recently entered into an EPC contract for the Henan Yudong Hazardous Waste Treatment Center project.

It is the first time that the group has won an EPC contract for a hazardous waste disposal project with an annual capacity of over 50,000 tons (54,000 tons). The breakthrough will expand the group's business scope and make Shanghai Electric more competitive in hazardous waste disposal.

Download PDF version Download PDF version

In case you missed it

Comau Unveils MyCo And MyMR Robots At Automatica 2025
Comau Unveils MyCo And MyMR Robots At Automatica 2025

Comau is highlighting the strong synergies between human ingenuity and technological excellence at Automatica 2025 with the launch of powerful new solutions designed to accelerate...

MKS Inc. Launches Newport ODiate Raman Filters
MKS Inc. Launches Newport ODiate Raman Filters

MKS Inc., a provider of enabling technologies that transform the world, has announced Newport™ ODiate® Raman Longpass Filters, precision optical filters specifically desi...

Alva's SlimTorq & Copley Servo Drive Exhibited At Automatica 2025
Alva's SlimTorq & Copley Servo Drive Exhibited At Automatica 2025

ALVA Industries (Alva) and Copley Controls are partnering to present a joint live demonstration at Automatica 2025, showcasing the integration of Alva’s SlimTorq™ frame...

vfd